Industrial Knowledge Intelligence

TheOperationsBrainYourPlantForgotItHad.

Every drawing, manual, permit, inspection and incident report — fused into a single living knowledge graph. Ask it anything. Get a cited answer in seconds, not a 35-hour search.

0%

answer accuracy

0%

citation precision

0×

faster than manual search

Grounded in real regulatory standards

OISDFactory ActDGMSPESO
The cost of fragmented knowledge

The data exists. Acting on it doesn't.

In asset-heavy industry, critical knowledge is scattered across a dozen systems — and the cost is measured in lost hours, downtime, and risk.

The problem

0%

Of an engineer's day lost to searching — eliminated

McKinsey, 2024

The problem

0

Disconnected document systems, unified into one

NASSCOM–EY

The problem

0%

Of unplanned downtime traced to knowledge gaps

BIS Research

The fix

0.0s

Average cited answer time vs. hours of manual search

AETHON benchmark

The Intelligence Layer

Six agents. One brain.

Not a search box. A reasoning layer that connects every document your plant has ever produced — and acts on what it finds.

They aren't siloed. Ingestion feeds the graph, the graph grounds the copilot, and the agents act on what it all reveals — one compound intelligence.

Local LLMVector RAGKnowledge GraphOCR pipelineOn-prem · data never leaves
Deployed across the facility

One brain. Every zone.

AETHON watches every corner of the plant in real time. Hover a zone to look inside.

Refinery Unit-4

Coke-oven battery · live gas + permit monitoring

Navigate

24/7

compound-risk watch

  • Gas + hot-work permit fusion
  • Evacuation in < 10 min
  • OISD-116 enforced

Refinery Unit-4

Processing Plant

Pressure vessels · vibration + thermal intelligence

Navigate

92%

compliance coverage

  • Predictive maintenance
  • RCA on recurring failures
  • PESO vessel checks

Processing Plant

Control Room

Command center · unified operations brain

Navigate

4,182

documents indexed

  • Cited copilot answers
  • Live knowledge graph
  • Audit packages on demand

Control Room

Storage & Dispatch

Tank farm · confined-space permit intelligence

Navigate

0

missed near-misses

  • Confined-space entry checks
  • Oxygen + H₂S fusion
  • Conflict detection

Storage & Dispatch

Maintenance Bay

Workshop · work-order & manual intelligence

Navigate

200×

faster than manual search

  • OEM manual lookup
  • Torque-spec conflict alerts
  • Work-order history

Maintenance Bay

Cited. Traceable. Trusted.

Answers you can prove.

Every response is grounded in a real document and traceable to the exact passage. Click any sentence to see its source. No hallucinations, no guessing — the difference between a chatbot and an operations brain.

  • Inline citations on every claim
  • Confidence score per answer
  • Outdated-source & superseded-clause flags
  • 1-Click Compliance Export
aethon · copilot

Does procedure SOP-44 comply with confined-space entry law?

Conflict Detected

No. SOP-44 omits continuous atmospheric monitoring required by Factory Act §36(1)(b). It also conflicts with the standby-person rule in OISD-105 §9.4.

Factory_Act_1948.pdf · p.42 | Rev 4.2 OISD-105.pdf · p.18 | Rev 2.0
confidence
94%
SME Verified
AETHON Core

The knowledge your plant can't afford to lose.

25% of senior engineers retire this decade — taking decades of operational wisdom with them. AETHON captures it, structures it, and keeps it working.

Deploy on-prem or in a secure private cloud. SOC2 Compliant.

Built for compliance with
ISO 9001OSHAOISDSOC 2